• Dealer

    Alliance Scientific Inc.

  • Manufacturer

    Bedcolab

  • Location

    Edmonton, AB

  • Architect

    DIALOG Design

  • Lab Planner

    DIALOG Design

  • General Contractor

    Stanley Construction Ltd.

University of Alberta redeveloped its 350,000 sq. ft. 10-story Chemistry Materials Engineering Building within four phases to accommodate growing healthcare and chemistry research needs.

The renovation of the Chemical Materials Engineering Building will enhance research innovation, commercialization and industry partnerships within areas of sustainable energy, advanced materials and natural resources.   Alliance Scientific installed roughly 200,000 net sq. ft. of Bedcolab casework and 260 Vanguard fume hoods.  This project is one of three that the Alliance Scientific and Bedcolab teams have completed at the University within a span of two years.

Bedcolab’s Products: 

  • Chorus “P” Leg Frame System
  • Forte Inset Metal Suspended Casework
  • Forte Inset Metal Casework
  • Vanguard High Performance Counter Top Fume Hoods
  • Vanguard Floor Mounted Fume Hoods